Ajou University repository

  • Results/Page
  • Sort by
  • In order
  • Authors/record

Showing results 1 to 10 of 778 (Search time: 0.0 seconds).

Bolt-free post-tensioned connection for steel-framed modular buildings and design for optimal preloadingoa mark
  • 2024-07-01
  • Journal of Constructional Steel Research, Vol.218
  • Elsevier Ltd
Experimental and numerical investigation of bolt-free preloaded connection for steel-framed modular buildingsoa mark
  • 2024-09-01
  • Journal of Constructional Steel Research, Vol.220
  • Elsevier Ltd
Structural performance of a new blind-bolted frame modular beam-column connection under lateral loadingoa mark
  • 2019-05-01
  • Applied Sciences (Switzerland), Vol.9
  • MDPI AG
Connecting performance evaluation of the Quick-Connector for modular steel construction
  • Lee, Doo Yong;
  • Cho, Bong Ho;
  • Jung, Dam I.;
  • Choi, Joon Young;
  • Lee, Jae Sub;
  • Cho, Kyung Hwan;
  • Park, Jong Kun;
  • Shin, Myoung Gyu
  • 2024-01-15
  • Engineering Structures, Vol.299
  • Elsevier Ltd
Automation for progress monitoring based by vision technology in a modular building factory
  • 2021-01-01
  • Journal of the Architectural Institute of Korea, Vol.37, pp.221-229
  • Architectural Institute of Korea
Integrated Management Software for Factory Production of Modular Buildingsoa mark
  • 2019-01-01
  • Advances in Civil Engineering, Vol.2019
  • Hindawi Limited
Inspection of intermodular connection locations for multistory modular buildingsoa mark
  • 2024-07-01
  • Measurement and Control (United Kingdom), Vol.57, pp.949-965
  • SAGE Publications Ltd
1 2 3 4 78