Ajou University repository

  • Results/Page
  • Sort by
  • In order
  • Authors/record

Showing results 1 to 10 of 3993 (Search time: 0.0 seconds).

Integrated Framework for Quantifying and Applying Nonworking Days to Planning and Scheduling for Determining Reasonable Construction Time
  • 2022-07-01
  • Journal of Management in Engineering, Vol.38
  • American Society of Civil Engineers (ASCE)
Augmented reality, deep learning and vision-language query system for construction worker safetyoa mark
  • Chen, Haosen;
  • Hou, Lei;
  • Wu, Shaoze;
  • Zhang, Guomin;
  • Zou, Yang;
  • Moon, Sungkon;
  • Bhuiyan, Muhammed
  • 2024-01-01
  • Automation in Construction, Vol.157
  • Elsevier B.V.
Integrated Management Software for Factory Production of Modular Buildingsoa mark
  • 2019-01-01
  • Advances in Civil Engineering, Vol.2019
  • Hindawi Limited
Enriching BIM with Unmanned Aerial Systems Data for Enhancing Construction Management Operationsoa mark
  • Rahnamayiezekavat, Payam;
  • Mourad, Mohamed;
  • Mostafa, Sherif;
  • Moon, Sungkon;
  • Senaratne, Sepani
  • 2022-09-01
  • Sustainability (Switzerland), Vol.14
  • MDPI
Automated detection of construction work at heights and deployment of safety hooks using IMU with a barometer
  • 2023-03-01
  • Automation in Construction, Vol.147
  • Elsevier B.V.
Inspection of intermodular connection locations for multistory modular buildingsoa mark
  • 2024-07-01
  • Measurement and Control (United Kingdom), Vol.57, pp.949-965
  • SAGE Publications Ltd
Enhancing occupant experience in defect repair services through text mining-based latent dirichlet allocation metric identificationoa mark
  • Kim, Jangsoon;
  • Shin, Wonwoo;
  • Han, Sang Hyeok;
  • Moon, Sungkon;
  • Kim, Jae Jun
  • 2024-03-01
  • Developments in the Built Environment, Vol.17
  • Elsevier Ltd
Blockchain-enabled supply chain coordination for off-site construction using Bayesian theory for plan reliability
  • 2023-11-01
  • Automation in Construction, Vol.155
  • Elsevier B.V.
1 2 3 4 400