Ajou University repository

Enriching BIM with Unmanned Aerial Systems Data for Enhancing Construction Management Operationsoa mark
  • Rahnamayiezekavat, Payam ;
  • Mourad, Mohamed ;
  • Mostafa, Sherif ;
  • Moon, Sungkon ;
  • Senaratne, Sepani
Citations

SCOPUS

5

Citation Export

Publication Year
2022-09-01
Publisher
MDPI
Citation
Sustainability (Switzerland), Vol.14
Keyword
building information modellingconstruction project managementdigital cultureprogress reportsmart construction siteunmanned aerial system
All Science Classification Codes (ASJC)
Computer Science (miscellaneous)Geography, Planning and DevelopmentRenewable Energy, Sustainability and the EnvironmentEnvironmental Science (miscellaneous)Energy Engineering and Power TechnologyHardware and ArchitectureComputer Networks and CommunicationsManagement, Monitoring, Policy and Law
Abstract
The use of an unmanned aerial system (UAS) in construction project management (CPM) is an emerging methodology aimed at improving the performance of project management practices. Despite the different functions that an UAS offers, which are well covered in various sources ranging from isolated exploratory works to ad hoc case studies, construction practitioners still demonstrate little interest in UAS technology. The underwhelming interest is rooted in a lack of an understanding of the value of the data collected using UASs and their potential to enrich Building Information Modelling (BIM). This research presents the details of the UAS developed to check the accuracy of work performed, along with the generation of the corresponding progress payment reports as well as referencing and tracking information in real time, for a residential project. This study also discusses combining the data generated from the UAS and 5D BIM to develop a smart construction site. The UAS–BIM combination enables the project stakeholders to be fully informed of the work’s progress and quality to avoid mistakes that could lead to extra costs and delays. The paper identified the main obstacles to applying the UAS via interviews with the project managers and tradespersons involved in the selected project. Assuredly, a digital culture is essential for a smart construction site to shift the project team from a passive data user to a more proactive analyzer to improve performance and site safety. Other obstacles include ethical reservations, legal requirements, liability risks, weather conditions, and the continuation of using an UAS in non-open-air construction environments.
ISSN
2071-1050
Language
eng
URI
https://dspace.ajou.ac.kr/dev/handle/2018.oak/32950
DOI
https://doi.org/10.3390/su141811362
Fulltext

Type
Article
Show full item record

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Moon, Sung Kon Image
Moon, Sung Kon문성곤
Department of Civil Systems Engineering
Read More

Total Views & Downloads

File Download

  • There are no files associated with this item.