Ajou University repository

  • Results/Page
  • Sort by
  • In order
  • Authors/record

Showing results 1 to 10 of 526 (Search time: 0.0 seconds).

Incentive-based coordination for scheduled delivery in prefab construction
  • 2024-01-01
  • Construction Management and Economics, Vol.42, pp.624-639
  • Routledge
Blockchain-enabled supply chain coordination for off-site construction using Bayesian theory for plan reliability
  • 2023-11-01
  • Automation in Construction, Vol.155
  • Elsevier B.V.
Workload-Aware Scheduling Using Markov Decision Process for Infrastructure-Assisted Learning-Based Multi-UAV Surveillance Networksoa mark
  • 2023-01-01
  • IEEE Access, Vol.11, pp.16533-16548
  • Institute of Electrical and Electronics Engineers Inc.
Escalator: An autonomous scheduling scheme for convergecast in TSCHoa mark
  • 2018-04-16
  • Sensors (Switzerland), Vol.18
  • MDPI AG
Improved Communication Reliability Considering Data Flow in RPL-based IoT
  • 오석호
  • 2018-08
  • The Graduate School, Ajou University
전자 부품의 초기 품질 확보를 위한 사전 품질 프로세스 구축
  • 이현석
  • 2015-02
  • The Graduate School, Ajou University
1 2 3 4 53