Ajou University repository

Incentive-based coordination for scheduled delivery in prefab construction
Citations

SCOPUS

2

Citation Export

DC Field Value Language
dc.contributor.authorKim, Yong Woo-
dc.contributor.authorRhee, Byong Duk-
dc.date.issued2024-01-01-
dc.identifier.urihttps://dspace.ajou.ac.kr/dev/handle/2018.oak/33914-
dc.description.abstractAn increasing number of projects are adopting prefabrication to economize on time, labor, and materials in fixed-position layout operations, such as construction, ship building, and aircraft manufacturing. In such contexts, independent contractor and fabricator make interdependent decisions, which calls for prudent supply chain management because performance relies on coordination between their decisions. Many studies have developed integrated systems and propose various algorithms for scheduling efficiency and reliability. Nevertheless, they pay scant attention to conflicting interests amongst independent partners, which may result in subpar performance not only for the supplier but for the contractor as well. Coordination of conflicting interests has been extensively studied in economics and supply chain management; yet, those studies focus on order-quantity decisions under demand uncertainty for profit maximization, while managers in fixed-position operations are more concerned about delivery decisions under scheduling uncertainty for cost minimization. We consider the case of construction and explore a contractual scheme that aligns the agents’ decisions for coordination in a construction supply chain. Specifically, we propose a supplier rebate for coordination: the supplier grants a rebate if the contractor accepts the shipment in accordance with the delivery schedule that the contractor initially chose. We show that the optimal rebate fully coordinates the supply chain to minimize the joint supply chain costs. Thus, both the contractor and supplier benefit from the coordination by negotiating a mutually acceptable way to allocate the savings in joint costs between them. We further show that the rebate motivates the contractor to enhance its work scheduling.-
dc.language.isoeng-
dc.publisherRoutledge-
dc.subject.meshAircraft manufacturing-
dc.subject.meshConstruction supply chain-
dc.subject.meshContext independent-
dc.subject.meshCoordination-
dc.subject.meshDelivery schedule reliability-
dc.subject.meshDelivery schedules-
dc.subject.meshPerformance-
dc.subject.meshPrefabrication-
dc.subject.meshRebate for scheduled delivery-
dc.subject.meshSchedule reliabilities-
dc.titleIncentive-based coordination for scheduled delivery in prefab construction-
dc.typeArticle-
dc.citation.endPage639-
dc.citation.startPage624-
dc.citation.titleConstruction Management and Economics-
dc.citation.volume42-
dc.identifier.bibliographicCitationConstruction Management and Economics, Vol.42, pp.624-639-
dc.identifier.doi10.1080/01446193.2024.2305763-
dc.identifier.scopusid2-s2.0-85183017474-
dc.identifier.urlhttp://www.tandf.co.uk/journals/titles/01446193.asp-
dc.subject.keywordConstruction supply chain-
dc.subject.keywordcoordination-
dc.subject.keyworddelivery schedule reliability-
dc.subject.keywordprefabrication-
dc.subject.keywordrebate for scheduled delivery-
dc.description.isoafalse-
dc.subject.subareaManagement Information Systems-
dc.subject.subareaBuilding and Construction-
dc.subject.subareaIndustrial and Manufacturing Engineering-
Show simple item record

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Rhee, Byong-Duk Image
Rhee, Byong-Duk이병덕
Department of Business Administration
Read More

Total Views & Downloads

File Download

  • There are no files associated with this item.