Citation Export
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Cha, Hee Sung | - |
dc.contributor.author | Kim, Ki Hyun | - |
dc.date.issued | 2018-05-01 | - |
dc.identifier.uri | https://dspace.ajou.ac.kr/dev/handle/2018.oak/29996 | - |
dc.description.abstract | A variety of Performance Measurement Systems (PMS) are aimed to provide owners and contractors with sound decision-making by identifying the Best Management Practices (BMP). Most of them, however, are not effectively linked with project characteristics (i.e., project type, owner requirement, and/or project circumstances). Furthermore, a continuous feedback system is necessary in order to pin-point “how-to” solutions for the subject project. Compared to the conventional PMS, this study is focused on; (1) identifying, if any, quantifiable relationships among project characteristics, project performance, and BMP; (2) developing a systematic framework for predicting the performance level of the subject project; and (3) validating the feedback algorithm by detecting the most suitable management practices for a given construction project. Although the proposed system is limited to Korean building construction industry, the main contribution of this research is twofold. First, this study has conducted the first-ever empirical analysis by quantifying the project performance and selecting the optimal BMP in consideration of project characteristics. Second, the continuous feedback approach in the field of PMS is proven by effectively diagnosing the vulnerability of the project in terms of the various types of project performance. | - |
dc.language.iso | eng | - |
dc.publisher | Springer Verlag | - |
dc.subject.mesh | Best management practices | - |
dc.subject.mesh | Building construction | - |
dc.subject.mesh | Building construction industry | - |
dc.subject.mesh | Construction projects | - |
dc.subject.mesh | Management practices | - |
dc.subject.mesh | Performance measurement system | - |
dc.subject.mesh | Performance prediction | - |
dc.subject.mesh | Project characteristics | - |
dc.title | Measuring Project Performance in Consideration of Optimal Best Management Practices for Building Construction in South Korea | - |
dc.type | Article | - |
dc.citation.endPage | 1625 | - |
dc.citation.startPage | 1614 | - |
dc.citation.title | KSCE Journal of Civil Engineering | - |
dc.citation.volume | 22 | - |
dc.identifier.bibliographicCitation | KSCE Journal of Civil Engineering, Vol.22, pp.1614-1625 | - |
dc.identifier.doi | 10.1007/s12205-017-0156-2 | - |
dc.identifier.scopusid | 2-s2.0-85027042896 | - |
dc.identifier.url | http://www.springer.com/engineering/journal/12205 | - |
dc.subject.keyword | Best Management Practice (BMP) | - |
dc.subject.keyword | Performance Measurement System (PMS) | - |
dc.subject.keyword | performance prediction | - |
dc.subject.keyword | Project characteristics | - |
dc.subject.keyword | quantitative analysis | - |
dc.description.isoa | true | - |
dc.subject.subarea | Civil and Structural Engineering | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.